From November to December 2020, after 60 days of emergency production, the 16-ton furnace is finally ready for shipment
In April 2021, the 16 ton coal fired steam boiler successfully arrived at the customer site. Although the epidemic was blocked, through the WeChat group, remote command, and on-site guidance from local engineers, the boiler can be successfully installed, the internal walls are masonry, the furnance is dried and boiled , and the commissioning is completed. Running smoothly now.
1. From November to December 2020, after 60 days of emergency production, the 16-ton furnace is finally ready for shipment
2. In April 2021, the 16 ton coal fired steam boiler successfully arrived at the customer site. Although the epidemic was blocked, through the WeChat group, remote command, and on-site guidance from local engineers, the boiler can be successfully installed, the internal walls are masonry, the furnance is dried and boiled , and the commissioning is completed. Running smoothly now.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project.
During this meeting, feel free to communicate your ideas and ask lots of questions.
Recommended